2] installation and network configuration, Mounting – Sanyo PJ-Net Organizer Plus POA-LN02 User Manual
Page 18

1
Chapter 2 Installation
Mounting
The AC cord must be disconnected from AC power outlet when mounting or removing this prod-
uct. It may damage the product.
Do not connect the AC cord until after connecting the LAN cable and computer.
[2] installation and network configuration
Caution
!
1
Disconnect the AC plug from the monitor.
2
Remove the screws on the back of the cabinet, and then remove the terminal covers.
3
Inser t the network unit into
the monitor, and fix it with the
screws.