beautypg.com

Gateway E-826R User Manual

Page 22

background image

Installation

www.gateway.com

17

Installation in a .280 Diameter thru-hole rack

To install the rail in a .280 diameter thru-hole rack:

1

Identify the correct mounting holes on the vertical rail, making sure that
the selected holes are on the same level.

2

Mount the front cover plate to the vertical rail in the identified holes by
using M6 (.200”) threaded bolts in the center two holes of the plate.

Important

The upper and lower tabs of the inside

plate do not enter the holes of the rack.

They deform when secured.

3

Install the chassis into the rack by aligning the chassis-mounted rails with
the mounted rail assemblies, then pushing the chassis into the rack.

4

Secure the chassis into the rack by bolting the autoloader tabs to the
upper and lower holes in the front cover plate using M6 (.200”) threaded
bolts.

Front cover
plate

10-32 inside
nut plate

Rail
assembly

Vertical rail

Autoloader tab
(autoloader not
shown)

This manual is related to the following products: