Step 2: run the hmcp certification tool, Step 1: run the hmcp certification, Tool – AltiGen MAXCS 7.5 Softswitch Deployment Guide User Manual
Page 10
Page 10 of 37
MAXCS 7.5 All-Software Solution Deployment Guide
13. After the files have been installed, click
Finish.
14. Click
Yes to restart the server.
Step 2: Run the HMCP Certification Tool
1. After the system restarts, click
Start > All Programs > AltiGen HMCP Certification Tool.
2. Stop all AltiGen switching services.
3. When the HMCP tool opens, in the Test Mode section, select
All In One. Set CPU Usage Threshold to
30%.
4. In the Codec Assessment section, enter the maximum number of codecs in those two fields (enter
2000 for both Max G.711 and Max Combo)
5. Click
Start Test in the Codec Assessment section.
6. Monitor the DPC Latency values. Instant latency should be less than 2000 us most of the time; Max
latency should be less than 6000 us.
7. Record the number of supported G.711 and Combo codecs in the test results. Then enter those
numbers in the Max G.711 Codec and Max Combo Codec fields (in the Codec Assessment section).
8. Under the System Load section, select both Disk IO access and Apply load to xx threads. Enter
1 for
the number of threads.
The tool will generate disk I/O access in the background and then measure DPC.
9. In the Test Mode section, set CPU Usage Threshold to
60%.
10. Click the
Start Test buttons in both the Codec Assessment section and the System Load section.
11. Monitor the DPC latency numbers. Instant latency should be less than 2000 us most of the time. Max
latency should be less than 6000 us.