beautypg.com

Chapter 3: operation – AERCO RECON 1000 User Manual

Page 39

background image

RECON Water Heaters Installation, Operation & Maintenance Manual

CHAPTER 3 – OPERATION

OMM-0103_0A

AERCO International, Inc.

 100 Oritani Dr.  Blauvelt, NY 10913

Page 39 of 178

GF-147

Phone: 800-526-0288 PRI:

10/28/2014

CHAPTER 3: OPERATION

3.1 INTRODUCTION

The information in this Chapter provides a guide to the operation of the RECON Water Heater
using the Control Panel mounted on the front of the unit. It is imperative that the initial startup of
this unit be performed by factory trained personnel. Operation prior to initial startup by factory
trained personnel will void the equipment warranty. In addition, the following WARNINGS and
CAUTIONS must be observed at all times.

--WARNING! -

 All of the installation procedures in Chapter 2 must be

completed before attempting to start the unit.

 Electrical voltages in this system include 120 and 24 volts ac. It

must be serviced only by factory certified service technicians

 Do not attempt to dry fire the unit. Starting the unit without a full

water level can seriously damage the unit and may result in
injury to personnel or property damage. This situation will void
any warranty.

Figure 3-1: Control Panel Front View

This manual is related to the following products: