beautypg.com

2 load transfer procedures, Transfer procedure, Re-transfer procedure – Emerson 250-400kVA User Manual

Page 32: 3 maintenance bypass load transfers, Figure 31 ups with two-breaker bypass cabinet, Load transfer procedures, Maintenance bypass load transfers, Refer to 2.4.2 - load, Transfer procedures, Notice

background image

Operation

26

2.4.2 Load Transfer Procedures

Changing the load from the UPS system to the UPS bypass is called a transfer. Changing the load

from UPS bypass to the UPS system is called a retransfer. Note that the UPS system control logic can

initiate automatic load transfers and retransfers. Refer to 2.6 - Automatic Operations.

Transfer Procedure

1. Press the “Transfer” menu button on the touchscreen.
2. The Transfer/Retransfer screen will appear in the multipurpose window (see Figure 18).
3. If the UPS output is with synchronization with the bypass, press the “Bypass” button. This will

transfer the load from UPS to Bypass.

Re-Transfer Procedure

1. Press the “Transfer” menu button on the touchscreen.
2. The Transfer/Retransfer screen will appear in the multipurpose window (see Figure 18).
3. If the UPS output is with synchronization with the bypass, press the “UPS” button. This will

transfer the load from Bypass to UPS.

2.4.3 Maintenance Bypass Load Transfers

To manually transfer the load between Maintenance Bypass and the UPS bypass line, carefully follow

these instructions. Do not transfer the load between Maintenance Bypass and the UPS module

(inverter) output. Use the Monitor/Mimic Display screen to verify the UPS bypass line is available.

Figure 31 UPS with two-breaker bypass cabinet

NOTICE

Risk of equipment damage. Failing to follow the proper operating sequence when operating

any circuit breaker may cause damage to the connected equipment. Operating a Maintenance

Bypass circuit breaker out of sequence could cut off power to the critical load.

Battery

System

DC Bus

BFB

CB2

CB1

MBD

MBB

MI

B

MBFB

BIB

RIB

UPS Module

Two Breaker Maintenance Bypass Cabinet

Main Input

Switchgear

Critical

Load