beautypg.com

SMA SB 1200 Installation User Manual

Page 25

background image

SMA Solar Technology AG

Electrical Connection

Installation Guide

SB12-17-IA-en-52

25

7. Pass the pressure screw and/or cable gland and socket tube over the AC cable.

8. Insert the protective earth PE (green-yellow) in the

screw terminal with the earth sign on the socket
element and tighten the screw.

9. Insert the neutral conductor N (blue) in the screw

terminal 1 on the socket and tighten the screw.

10. Place phase L (brown or black) into screw

terminal 2 on the socket insert and tighten the
screw.

11. Terminal 3 on the socket element remains unused.
12. Make sure the wires are securely connected.

Size used

Procedure

PG13.5

• Push the sealing ring into the

fastening case.

• Lead the pressure screw

PG13.5 and the fastening
case including the sealing
ring over the AC cable.

• Lead threaded sleeve over

the AC cable.

PG16

• Pass the cable gland PG16

over the AC cable.

• Lead threaded sleeve over

the AC cable.

This manual is related to the following products: