2 connection to the public grid (ac), 1 conditions for the ac connection, Connection to the public grid (ac) – SMA SB 1200 Installation User Manual
Page 22: Conditions for the ac connection
Electrical Connection
SMA Solar Technology AG
22
SB12-17-IA-en-52
Installation Guide
5.2 Connection to the Public Grid (AC)
5.2.1 Conditions for the AC Connection
Cable Sizing
The conductor cross-sectional area should be dimensioned so output losses do not exceed 1 % at
nominal power.
The maximum wire lengths relative to the conductor cross-section are shown in the following table.
The conductor cross-sectional area required in individual cases depends on the following factors
among others:
• Ambient temperature,
• Routing method,
• UV resistance,
• Conduction losses,
• Valid installation guidelines of the respective country (of the installation location).
Cable Requirements
Connection requirements of the utility operator
Comply with the connection requirements of your utility operator!
Conductor cross-section
Maximum wire length
SB 1200
SB 1700
1.5 mm²
18 m
15 m
2.5 mm²
30 m
22.5 m
Position
Description
Value
A
External diameter
9 mm …17 mm
B
Conductor cross-section
max. 2.5 mm²
C
Strip insulation
4 mm … 5 mm