Cable requirements:

☐ UV-resistant for outdoor use
☐ Number of insulated conductor pairs and insulated conductor cross-section:

at least 2 x 2 x 0.22 mm

2

or at least 2 x 2 AWG 24

☐ External diameter of the cable: the maximum external diameter of the cable depends on the size

of the cable gland included in the delivery.

☐ Cable category: Cat5, Cat5e, Cat6, Cat6a, Cat7
☐ Cable shield: SF/UTP, S/UTP, SF/FTP, S/FTP
☐ Plug type: RJ45 for Cat5, Cat5e, Cat6, Cat6a
☐ Cable length between two nodes: max. 50 m with patch cable, max. 100 m with installation

cable

SMA Solar Technology AG recommends the following cable types:

• For outdoor use: SMA COMCAB-OUTxxx*
• For indoor use: SMA COMCAB-INxxx*

The cables are available in the lengths xxx = 100 m, 200 m, 500 m, and 1,000 m.

5.3 Installing the Speedwire/Webconnect Data Module

2. Release the screw of the display far enough to

allow the display to be flipped up.

3. Flip up the display until it snaps into place.
4. Push the pre-mounted filler plug out of the second

hole from the left in the inverter enclosure and retain
it for future decommissioning.

1.

Danger to life due to electric shock when opening the inverter
High voltages are present in the conductive components of the inverter. Touching live
components results in death or serious injury.

• Disconnect the inverter from all voltage sources on the AC and DC sides and open it

(see the inverter installation manual). Observe the waiting time to allow the capacitors to