Internal Events

ID

Status
message

Description

Action

DNO Hotline PV

201–208

The internal temperature of the

inverter is too high.

Check the inverter is not covered and that the

ventilation duct is not blocked. If not, call the

installer.

-

x

-

209, 210

Voltage on DC bus is too high.

Reset the inverter by disconnecting DC and AC,

using the switches. If the event is repeated, call

the installer. Installer:

Check the maximum PV voltage using the display

to see if it is above the limits.

-

x

-

211

Fan rpm low

Fan speed is too low.

Is the inverter fan blocked?

Yes: Clean the fan, No: Call the installer.

-

x

-

212

DC bus

balance

timeout

Inverter unable to balance DC bus.

Call the installer.

Installer: Call service.

-

x

-

213–215

Internal error Voltage measured

before and after the relay differs by

more than 20 V.

Call the installer.

Installer: Call service.

-

x

-

216–221

Current measured on AC side is too

high.

Call the installer.

Installer: Call service.

-

x

-

224

RCMU over

range

A wire is broken in the RCMU.

Call the installer.

Installer: If self-test does not complete

successfully, call service partner.

-

x

-

225–240

Failure in Memory/ EEPROM.

Restart the inverter. If event persists, call the

installer.

Installer: Call service.

-

x

-

241, 242,

249

Internal communication error.

-

x

-

243, 244

Internal error.

-

x

-

247

FSP plausi-

bility fault

A plausibility fault has occurred in

the functional safety processor.

Check event log for other grid events (1-55) and

follow the instructions for these events. If the

event persists, call the installer.

-

x

-

248, 251

Self test failed

FSP fail safe

The self-test has failed.

-

x

-

252-254

Current measured on AC side is too

high.

Call the installer.

Installer: Call service.

-

x

-

255–257

Islanding protection trip.

Call the installer.

Installer: Call service.

-

x

-

260

The resistance between ground and

PV is too low for the inverter to start

up. This will force the inverter to

make a new measurement after 10

minutes have passed.

Call the installer.

Installer: Call service.

-

x

-

261-262

PV current measurements failed.

Call the installer.

Installer: Call service.

-

x

x

Table 4.4 Internal Events

Service

L00410568-03_2q / Rev. date: 2014-06-20

35

4

4