Finishing cycle run, Please note while programming – HEIDENHAIN TNC 640 (34059x-01) Cycle programming User Manual
Page 307

HEIDENHAIN TNC 640
307
13.1
0
TURN CONT
OUR-P
A
RALLEL (Cy
c
le 815)
Finishing cycle run
If the Z coordinate of the starting point is less than the contour starting
point, the TNC positions the tool in the Z coordinate to set-up
clearance and begins the cycle there.
1
The TNC runs the infeed motion at rapid traverse.
2
The TNC finishes the finished part contour (contour starting point
to contour end point) at the defined feed rate Q505.
3
The TNC returns the tool to set-up clearance at the defined feed
rate.
4
The TNC positions the tool back at rapid traverse to the cycle
starting point.
Please note while programming:
Program a positioning block to a safe position with radius
compensation R0 before the cycle call.
The tool position at cycle call (cycle starting point) affects
the area to be machined.
The TNC takes the cutting geometry of the tool into
account to prevent damage to contour elements. If
complete machining with the active tool is not possible, a
warning is output by the TNC.
Before calling the cycle you must program the cycle 14
CONTOUR
to define the subprogram number.
Also refer to the fundamentals of turning cycles (see
page 286).