3.6 Verifying Installation

Each time before you power on the firewall during installation,

verify that:

z

Enough room has been left around the firewall chassis for
adequate heat dissipation and the workbench is stable.

z

The power source fits the firewall.

z

The PGND wire of the firewall is correctly connected.

z

The firewall has been correctly connected to other devices,
such as a console terminal.

Caution:

Installation verification is extremely important, because the normal
functioning of the firewall relies on its firm installation, proper
grounding, and correct power feed.