beautypg.com

Safety tests during operation – Seaward SafeCheck 8 User Manual

Page 36

background image

Safety Tests during operation

35







If this message is displayed then the Safe Check 8 is faulty and
should be returned to your Clare agent for repair.

Safety Tests during operation

The Tester performs self-tests during normal operation. An internal
Earth Bond test and a low voltage test are performed prior to
applying mains power to any EUT (including Leakage tests). If the
internal Earth Bond test fails, the following message will be
displayed: -






If this message is displayed then the Safe Check 8 is faulty and
should be returned to your Clare agent for repair.

If the low voltage test fails, then either of the following warnings will
be displayed:-











--------------------WARNING--------------------

INTERNAL RELAY FAULT.CANNOT PROCEED.

--------------------WARNING--------------------

INTERNAL RELAY FAULT.CANNOT PROCEED.

--------------------WARNING--------------------

APPLIANCE MAY BE SHORT CIRCUIT
PRESS THE ENTER BUTTON IF SAFE

PRESS THE RED BUTTON TO ABORT

--------------------WARNING--------------------

FUSE MAY BE OPEN CIRCUIT

PRESS THE ENTER BUTTON IF SAFE

PRESS THE RED BUTTON TO ABORT