Safety tests during operation – Seaward SafeCheck 8 User Manual
Page 36

Safety Tests during operation
35
If this message is displayed then the Safe Check 8 is faulty and
should be returned to your Clare agent for repair.
Safety Tests during operation
The Tester performs self-tests during normal operation. An internal
Earth Bond test and a low voltage test are performed prior to
applying mains power to any EUT (including Leakage tests). If the
internal Earth Bond test fails, the following message will be
displayed: -
If this message is displayed then the Safe Check 8 is faulty and
should be returned to your Clare agent for repair.
If the low voltage test fails, then either of the following warnings will
be displayed:-
--------------------WARNING--------------------
INTERNAL RELAY FAULT.CANNOT PROCEED.
--------------------WARNING--------------------
INTERNAL RELAY FAULT.CANNOT PROCEED.
--------------------WARNING--------------------
APPLIANCE MAY BE SHORT CIRCUIT
PRESS THE ENTER BUTTON IF SAFE
PRESS THE RED BUTTON TO ABORT
--------------------WARNING--------------------
FUSE MAY BE OPEN CIRCUIT
PRESS THE ENTER BUTTON IF SAFE
PRESS THE RED BUTTON TO ABORT