Seaward SafeCheck 8 User Manual
Page 14

Selecting The Test Settings
13
Earth Bond Test
Current = 25A
Duration = 2 seconds
Pass level = below 0.5
Ω
Line Short to Case
Voltage = 40Vac
Duration = 2 seconds
Pass level = below 1mA
Flash Test
Voltage = 1250Vac
Duration = 2 seconds
Pass level = below 3mA
Power/Leakage Test
Voltage = Supply voltage
Duration = 5 seconds
Power Pass level = Nominal >=4
Ω
Leakage Pass level = below 1mA
B:
DOUBLE INSULATED / CLASS 2
This test selection is for domestic and hand tool products that have
a plastic or insulated case and that require a full range of tests
including Flash. The standard test settings for this selection are:
Line Short to Case
Voltage = 40Vac
Duration = 2 seconds
Pass level = below 1mA
See also other documents in the category Seaward Equipment:
- AGL-5 (2 pages)
- Apollo 500 (21 pages)
- B433R (16 pages)
- Checkbox 17 Plus (4 pages)
- Apollo 600 (32 pages)
- B255 (40 pages)
- A203ES (10 pages)
- A252 (35 pages)
- DO4000 (22 pages)
- DO5000 Interface (41 pages)
- DO5000 Series (36 pages)
- DO7e (24 pages)
- DP6 (22 pages)
- DO7010 (44 pages)
- ARE 1557 (31 pages)
- Europa Pac Plus (53 pages)
- Supernova Elite (118 pages)
- HAL Scan (164 pages)
- G2000 (44 pages)
- IRT 1557 (21 pages)
- KD1E (22 pages)
- LLT (2 pages)
- PAC3760 (2 pages)
- PAC 1500Xi (12 pages)
- PAC 1000 (10 pages)
- PAT2000i (29 pages)
- PATGuard Elite Quick start (2 pages)
- PATGuard Elite SQL Quick start (2 pages)
- PATGuard Pro 2 (77 pages)
- PATguard Pro 2 Quick start (2 pages)
- PATGuard Time Manager (12 pages)
- PATGuard Work About Quick start (4 pages)
- PH3 LLT (6 pages)
- PATGuard Work About (53 pages)
- Solar Power Clamp (31 pages)
- PowerGuard Pro (29 pages)
- PowerPlus 1557 (62 pages)
- PowerPlus PC (44 pages)
- 100 PrimeTest (24 pages)
- PATGuard 3 (153 pages)
- 200 PrimeTest (34 pages)
- 250 PrimeTest (48 pages)
- 220 PrimeTest (34 pages)
- 50 PrimeTest (20 pages)
- RH9A Series (16 pages)