beautypg.com

Seaward SafeCheck 8 User Manual

Page 19

background image

The Test Sequence

18

Depending on test selection, the Flash test is performed at either
1250Vac or 2500Vac. For Metal Cased products, the test is
performed at 1250Vac.

The test voltage will be displayed at the top of the screen.

If testing a Double Insulated product, use the Flash probe and apply
it to a suitable test point on the product under test.

6: Leakage Test / Power Test

WARNING - The product under test will be powered up

during this test. It is essential to ensure that no
hazard will result from the product function e.g.
spinning drill etc.


During the test, the tester will display the leakage current to Earth in
the main readout and the power dissipation in the secondary
readout.

Power tests are not normally performed during power cord tests.

7: Polarity Test

The Polarity test is only performed during Power Lead Tests.

The test checks for correct wiring in the power cord extension.

8: Testing is now complete.

At the end of the test sequence the End of Test menu will be
displayed. The menu will offer the following options: -

New Test

Selecting New Test will cause the tester to store the test results and
return to the Product ID dialogue box.