beautypg.com

Seaward 220 PrimeTest User Manual

Page 24

background image

Operating Instructions

Primetest 220

During an insulation resistance measurement a

high voltage is applied between the Live/Neutral

of the EUT and the black test probe. It should be

noted that this voltage can also be present on

bare metalwork of the EUT.

8.5.6 The insulation resistance of the EUT is measured

over a period of 2 seconds. The large display 2
indicates a digital insulation M

, the small display

3 indicates a PASS/FAIL status. An additional
visual display of a ✓ or ✗ also indicates PASS/FAIL
status.

8.5.7 Insulation resistance value is held on the LCD

display for a period of 1 second. The displayed
insulation resistance will flash if a FAIL and remain
steady if a PASS.

8.5.8 The result will remain displayed until another rotary

switch or pushbutton action.

8.6 Touch Leakage Current,

See figure 8

Attention - before a touch leakage current test

is performed on a Class II EUT the operator

must ensure that the EUT has already passed a

Class II safety test.

Attention - An RCD may be triggered if the EUT

is defective.

Warning - It is important that the user verifies

that an appliance with moving parts (e.g. an

electric drill) is safely mounted to allow

movement without causing damage to

equipment or personnel.

8.6.1 Plug the supplied mains power lead into the mains

power socket 13 on the PrimeTest 220.

8.2.2 Plug the other end of the supplied mains power

lead into a mains power socket.

17

PrimeTest 220 REV 1 5/12/05 1:52 pm Page 22