6 - testing, Completion checklist, 6 – testing – Gasboy 1000 Series Fuel Management System Installation User Manual
Page 67

MDE-4344A Series 1000 Fuel Management System Installation Manual · November 2008
Page 63
Completion Checklist
Testing
6 – Testing
Completion Checklist
The information below will help verify proper installation of the Series 1000 System. Review
it before testing the pumps and/or dispensers in the manual, override position.
1
Is there adequate clearance around the Series 1000? (Refer to
2
Is the optional data terminal located in a clean, office-type environment? (Refer to
3
Is the optional external modem located in an office-type environment or a protective
enclosure? (Refer to
4
Is all the wiring in metal conduit? (Refer to
exception to the metal conduit rule is RS-422 as noted in
.
5
Is the AC and DC wiring in separate conduits, troughs, and so on (except as noted in
on
).
6
Is the system/peripheral equipment on a separate dedicated breaker? (Refer to
on
7
Is the system grounded properly? (Refer to
on
8
Are pumps over 3/4 HP at 115/230 VAC equipped with a starter relay? (Refer to
on
9
Is the correct gauge wire installed for the:
• System? (
on
• Pumps? (
• Dispensers? (
)
• Pulsers? (
on
• Communication lines? (
10
Are the communication lines under the maximum allowable distance. RS-232: 100 feet,
RS-422: 1500 feet except as noted in
on
and
on
11
If the system has an external modem, is the phone line installed? (
)
12
Is there fuel in the tanks?