Flowserve ISC User Manual
Page 14

27
If the application limits for running in accordance with these
instructions cannot be observed, the temperature of the sup-
ply liquid and / or the installed components must be moni-
tored at all times by a device that shuts down the machine
once a critical temperature is reached. This device can con-
sist of resistance thermometers or thermoelements.
The seal chamber must be vented carefully before startup.
7.6 Observe the start-up. If the seal runs hot or squeals, check the
seal flush system. Do not allow the equipment to run for any
extended time if the seal gets hot or squeals.
8. Dual Seal Piping and Functional Recommendations
26
Forced ventilation of the seal chamber must be ensured when
the circulation pipe is connected. Should there be gas or air
pockets in the sealing chamber, these can accumulate with the
rotation at the outer diameter of the seal gap at machine start-
up. This causes the machine to run dry at the seal gap for an
indefinite period, and the seal faces can become damaged.
Figure 8
. Flush taps
a
and
b
in
the gland are barrier fluid
inlet and outlet ports.
Use Figure to determine
which ports to use as inlet
and outlet.
Shaft rotation from exposed
end of gland
Inlet Outlet
Clockwise (CW)
Port
b
Port
a
Counterclockwise (CCW) Port
a
Port
b
Figure 9.
Double ISC with Supply Tank