beautypg.com

Comtech EF Data PCB-4300 User Manual

Page 47

background image

PCB-4300 1:2 Phase Combiner

Revision 2

Flash Upgrading

MN/PCB4300.IOM

4–5

Step Procedure

9

When prompted, reconnect the

SSPA COM 1 J2, SSPA COM 2

J3, and SSPA COM 3 J4
connector cables.

10

Once communications have
been established between the

PC and PCCB, the upload will

take place – do not interrupt
this upload process
.

Note: If the upload is not

successful for any reason –
e.g., the communications cable

is not physically connected, the

wrong COM port is specified,

the user inadvertently
interrupted the upload, etc. –

the user may troubleshoot the

setup as needed, then click on

Repeat Upload’ or ‘Go Back
to Start
’ to resume or retry the

upload process.