beautypg.com

Installation, Unpacking and inspection, Rack mount installation – Comtech EF Data UT-4579 User Manual

Page 25: Chapter 2, 1 unpacking and inspection, 2 rack mount installation, Chapter 2. installation

background image

9

Chapter 2. Installation

Unpacking and Inspection

9

Rack Mount Installation

9

Prime Power Connection

10

Cable Connections

10

2.1 U

NPACKING AND

I

NSPECTION

Inspect the shipping container for damage. If the shipping containers are damaged, keep
them until the contents of the shipment have been carefully inspected and checked for
normal operation.
Remove the packing list from the outside of the shipping carton. Open the carton and
remove the contents, checking the contents against the packing list. Verify completeness
of the shipment and that the unit functions correctly. If damage is evident, contact the
carrier and Comtech EF Data immediately and submit a damage report.
If the unit needs to be returned to Comtech EF Data, please use the original shipping
container.

2.2 R

ACK

M

OUNT

I

NSTALLATION

The UT-4579 Up Converter is designed for installation in a standard 19 inch rack cabinet
or enclosure. The converter chassis requires 1-3/4 inches of panel height space.
Adequate air ventilation should be provided on both sides of the rack mounted
equipment.
If the converter is to be mounted on slides, the slides must be the Comtech EF Data rack
slides provided with the converter. Mount the slides on the sides of the converter chassis
with the mounting hardware provided. Then, install the slide rails in the rack cabinet
enclosure.
Slide the converter into the front of the rack cabinet until the rear of the front panel
contacts the mounting surface of the cabinet. Secure the converter to the rack cabinet
with four screws inserted through the converter’s front panel slotted holes.