beautypg.com

Comtech EF Data IPSat GW1000 User Manual

Page 44

background image

01-0945-401 Rev. A 08/2004

34


6 Install the contact. Solder on the contact using 60/40 solder. Feed solder through solder hole while

heating the contact.

7 Install the connector body onto the cable. Check for proper pin height. Apply Locktite 242 to the clamp nut

threads. Thread the clamp nut into the connector body. Torque to 50 in-lbs. Check pin height.


8 Install strain relief boot. Position the boot onto the connector body. Apply hot air until boot is smoothly

seated onto both the cable and connector. Use only an adhesive lined shrink boot.