Errata b, Efdata documentation update – Comtech EF Data KST-12025 User Manual
Page 5

Filename: T_ERRATA
1
Errata B
EFData Documentation Update
Subject:
Changes to power input requirements.
Date:
April 9, 1997
Document:
KST-12025 Ku-Band Satellite Terminal System Installation and
Operation Manual, Rev. 1, dated August 19, 1996
Part Number:
MN/KST12025.EB1
Collating Instructions:
Attach this page to pages 1-1 and 2-21
Comments:
The following changes provide the correct information for AC power input requirements. This
information will be incorporated into the next revision.
Change Specifics:
As incorrectly specified Chapter 1, page 1-1:
Prime Power Options
90 to 230 VAC, 47 to 63 Hz, using a 6’ cable North
American 3-prong plug, or 48 VDC (40 to 50 V)
This information should be changed to:
Prime Power Options
190 to 240 VAC, 47 to 63 Hz, using a 6’ cable North
American 3-prong plug, or 48 VDC (40 to 50 V)
As incorrectly specified Chapter 2, page 2-21:
The AC power is supplied to the RFT by a 3-pin power connector. Normal input voltage is 90 to 232 VAC,
47 to 63 Hz.
This information should be changed to:
The AC power is supplied to the RFT by a 3-pin power connector. Normal input voltage is 190 to 240 VAC,
47 to 63 Hz.