beautypg.com

Tove, Nstallation, Cont – Avalon Firestyles B-Vent-1995 User Manual

Page 14: Vent requirements

background image

P

AGE

14

S

TOVE

I

NSTALLATION

(

CONT

.) -

For qualified installers only!

Vent Requirements

!

Always maintain the required 1" clearance (air space) to combustible materials to prevent a fire
hazard. Do not fill air spaces with insulation.

!

The gas appliance and vent system must be vented directly to the outside of the building, and never
be attached to a chimney serving a separate solid fuel or gas-burning appliance.

¥

Minimum 5' vertical rise from top of stove (see the illustration below)

¥

When the vent passes through a wall, a wall thimble is required. When the vent passes through a
ceiling, a support box or firestop is required. When the vent passes through the roof, a roof flashing
and storm collar are required. Follow the instructions and requirements provided with the vent when
installing.

¥

The horizontal run may not exceed 50% of the vertical rise

¥

Use 4" dia. B vent for entire system from one manufacturer (don't mix brands)

- or -

Use high temperature factory built or masonry chimney with listed gas chimney liner running the
entire length

¥

Vent termination must be above the roof and not below any eaves or overhangs

Type B Vent

Vent must

terminate a

minimum 1'

above the roof.

Listed Gas

Chimney Liner

Maintain 1"

minimum

clearance

Provide a 1/4" rise

for every 12" run.

Min. 5' Rise

High

temperature

factory built

chimney and

connector

Chimney with Liner

Standard Installation

Exterior Vent

Min. 5' Rise

The total

horizontal

run must

not exceed

50% of the

vertical rise

Do not block gas

vent termination

This manual is related to the following products: