beautypg.com

Controlling tests with nupad, Nupad functions overview – Xtramus NuStreams-P6GW V1.0 User Manual

Page 75

background image


75

E-mail: [email protected]

Website: www.Xtramus.com

XTRAMUS TECHNOLOGIES

®

6. Controlling Tests with NuPAD

NuPAD is an assistant extension keypad, especially designed for running

tests at mass production line.

With all test parameters set and stored in NuStreams-P6GW, NuPAD

allows users to perform tests without changing pre-set parameters.

6.1. NuPAD Functions Overview

Description

A Connection

Port

Connecting NuPAD with NuStreams-P6GW’s Console Port.

B LCD

Screen

Displaying system information, status, and test results.

C Control

Buttons

¾

|| Pause: Press this button to pause the current running test.
Press this button again to resume the test.

¾

■ Stop: Press this button to stop the current running test.

¾

► Run: Press this button to start test.

D/E System

LEDs

¾

Sys/Link/Alarm: Showing NuPAD running status.

¾

Power: When NuPAD is connected to NuStreams-P6GW’s
Console Port, the Green Power LED will be ON.

¾

Pass/Fail: If the test passed, the Pass/Fail Green LED will be
ON; if the test failed, the Pass/Fail Amber LED will be ON.

¾

Step 1~4: Showing the progress of the test.

This manual is related to the following products: