8 response time (seconds), 9 maximum power per calendar, Response time (seconds) – CIRCUTOR MDC-20 User Manual
Page 35: Maximum power per calendar

MDC-20
User Manual
Page 35 of 58
The following fields must be configured when selecting the sliding blocks window:
Fig.8-12 . – Parameters to be configured in the sliding window
• Integration time (seconds):Duration time of each of the N partial integration intervals
included in an Integration Period.
The Integration Period must be a multiple of the Integration Time (chapter
8.1.1).
• Excess (%): Excess energy allowed in the integration subinterval always ensuring that
the total energy for the period is less than the configured maximum.
8.1.8 Response time (seconds)
Fig.8-13 . – Response times
• Time between actions: This is the time established between actions. A value of 60
seconds means that once a load has been connected or disconnected, the controller will
wait 60 seconds before carrying out any other operation.
• Non-reclosing time at end of period: Time before the end of an integration period,
during which no new loads are connected until a new integration period has begun.
8.1.9 Maximum power per calendar:
Within the maximum power calendar option you can configure a maximum set point power
according to a time discriminator or calendar, in cases in which the maximum power changes
are based on time intervals or other conditions.
Fig.8-14 . – Selection of calendar