6 electrical installation – Pilz PMCtendo SZ.41/0/1/2/7/K/H/60/00 User Manual
Page 24
Operating Manual PMCtendo SZ
1002405-EN-03
24
6 Electrical installation
2
Attach the union nut evenly on the angular socket:
3
Turn the screw cap of the union nut in the direction of "close" up to the limit
stop:
Connect the cable with springtec® plug connector
1
Align the respective union nuts of the green encoder plug and the orange
power connector so that the points on the union nuts and the angle con-
nection socket are facing each other:
This manual is related to the following products:
- PMCtendo SZ.51/0/1/2/7/K/H/30/00 PMCtendo SZ.41/0/1/2/7/K/H/30/00 PMCtendo SZ.55/1/1/2/7/F/H/30/00 PMCtendo SZ.75/0/1/2/7/K/H/30/00 PMCtendo SZ.71/0/1/2/7/K/H/30/00 PMCtendo SZ.75/0/1/2/7/W/H/30/00 PMCtendo SZ.42/1/1/2/7/K/H/30/00 PMCtendo SZ.52/1/1/2/7/K/H/30/00 PMCtendo SZ.72/0/1/2/7/K/H/60/00 PMCtendo SZ.55/0/2/2/7/K/H/45/00 PMCtendo SZ.44/0/1/2/7/K/H/30/00 PMCtendo SZ.73/0/1/2/7/K/H/45/00 PMCtendo SZ.52/0/1/2/7/K/H/30/00 PMCtendo SZ.73/0/1/2/7/F/H/30/00 PMCtendo SZ.51/0/2/2/7/K/H/30/00 PMCtendo SZ.53/0/1/2/7/K/H/30/00 PMCtendo SZ.53/0/1/2/7/K/H/60/00 PMCtendo SZ.51/1/1/2/7/K/H/60/00 PMCtendo SZ.75/0/2/2/7/F/H/30/00 PMCtendo SZ.73/0/1/2/7/K/H/30/00 PMCtendo SZ.41/1/2/2/7/K/H/60/00 PMCtendo SZ.41/0/2/2/7/K/H/60/00 PMCtendo SZ.75/2/1/2/7/F/H/45/00 PMCtendo SZ.55/0/2/2/7/F/H/30/00 PMCtendo SZ.51/1/2/2/7/K/H/60/00 PMCtendo SZ.51/0/2/2/7/K/H/60/00