beautypg.com

Commissioning, 15 supply voltage ac dc – Pilz PNOZ m EF Multi Link User Manual

Page 15

background image

Commissioning

Operating Manual PNOZ m EF Multi Link
1003018­EN­02

15

Supply voltage

AC

DC

24V

0V

n.c.

FE

Connecting 2 base units PNOZmulti 2 via PNOZ m EF Multi Link

PNOZ m EF Multi Link

PNOZ m EF Multi Link

Connection cable configuration when using: 
­ 2 plug­in connectors "SafetyNET p Connector RJ45" 
­ 1 connection cable "SafetyNET p Cable" 
(available as accessory, see order reference)

yellow

white

orange

blue

yellow

white

orange

blue

yellow

white

orange

blue

yellow

white

orange

blue

SafetyNET p Connector RJ45

SafetyNET p Connector RJ45

SafetyNET p Cable

A

B

C

D

A
B

C

D

PIN 1

PIN 3

PIN 2

PIN 6

PIN 6

PIN 2

PIN 3

PIN 1

6.3

Download modified project to the PNOZmulti safety system

As soon as an additional expansion module has been connected to the system, the project
must be amended using the PNOZmulti Configurator. Proceed as described in the operat­
ing instructions for the base unit.

NOTICE

For the commissioning and after every program change, you must check
whether the safety devices are functioning correctly.