Preparing for operation

6

Commissioning

6.3

Preparing for operation

6300

Preparing for operation

6-

6.3.1

Download modified project to the PNOZmulti safety system

Download modified project to the PNOZmulti safety system

6-

Verdrahtung_multi_Modul_Betr_geaend_Projekt_BA

As soon as an additional expansion module has been connected to the

system, the project must be amended using the PNOZmulti Configura-

tor. Proceed as described in the operating instructions for the base unit.

6.3.2

Preparing for operation

Preparing for operation

6-

Betriebsbereitschaft herstellen_EtherCAT

Install Device Description File

Install the

Device Description File

in your configuration software.

You can only then use the PNOZ mc2.1p.

Connect the supply voltage to the base unit:

Terminals 24 V and A1 (+): + 24 VDC

Terminals 0 V and A2 (-) : 0 V

6.3.3

Connection example

Connection example

6-

Anschlussbeispiel

NOTICE

For the commissioning and after every program change, you

must check whether the safety devices are functioning correctly.

EtherCAT

Slave 2

EtherCAT

Master

2

EtherCA

T

PNOZ mc2p

LINK

ACT2

LINK

ACT1

ERR

RUN

773710

2

EtherCA

T

PNOZ mc2p

LINK

ACT2

LINK

ACT1

ERR

RUN

773710

2

EtherCA

T

PNOZ mc2p

LINK

ACT2

LINK

ACT1

ERR

RUN

773710

EtherCAT

Slave 1

EtherCAT

Slave 3