beautypg.com

Chapter 2, Installation, Environmental conditions – Parr Instrument 6200 User Manual

Page 11: Filling the jacket reservoir, Power connection, Jacket cooling water connection, Chapter 2 9, Hapter

background image

Installation

6200

2

w w w . p a r r i n s t . c o m

9

c

haPter

2

Installation

Note:

Some of the following manual sec-

tions contain information in the form of

warnings, cautions and notes that require

special attention. Read and follow these

instructions carefully to avoid personal injury

and damage to the instrument. Only quali-

fied personnel should conduct the instal-

lation tasks described in this portion of the

manual.

Environmental Conditions

The 6200 Calorimeter is completely assembled and
given a thorough test before it is shipped from the
factory. If the user follows these instructions, instal-
lation of the calorimeter should be completed with
little or no difficulty. If the factory settings are not
disturbed, only minor adjustments will be needed to
adapt the calorimeter to operating conditions in the
user’s laboratory.

This apparatus is to be used indoors. It requires
at least 8 square feet of workspace on a sturdy
bench or table in a well-ventilated area with con-
venient access to an electric outlet, running water
and a drain. The supply voltage must be within ±
10% of marked nominal voltage on the apparatus.
The supply voltage receptacle must have an earth
ground connection.

Required Consumables, Utilities and Power

Requirements

The 6200 Calorimeter System requires availability of
Oxygen, 99.5% purity, 2500 psig maximum.

The power requirements for the subassemblies of
the 6200 Calorimeter are:

Calorimeter
120VAC, 6.0 Amps. 50/60 Hz
240VAC, 3.0 Amps. 50/60 Hz

Printer
100 to 240 VAC, 0.35 Amps 50/60 Hz

Printer Supplies
334C Printer Paper
335C Printer Ribbon

Filling the Jacket Reservoir

The water reservoir of the calorimeter must be filled

with approximately 1.4 liters of water (distilled or

de-ionized preferred). This must be done prior to

turning on the heater and the pump. The reservoir is

filled through the tank fill elbow on the back of the

calorimeter. The tank is full once water stands in the

horizontal run of the filling elbow.

Power Connection

Plug the power line into any grounded outlet provid-

ing proper voltage that matches the specification

on the nameplate of the calorimeter. The calorim-

eter will draw approximately 300 watts of power.

Grounding is very important not only as a safety

measure, but also to ensure satisfactory controller

performance. If there is any question about the

reliability of the ground connection through the

power cord, run a separate earth ground wire to the

controller chassis.

Turn the power switch to the on position. After a

short time, the Parr logo will appear on the LCD

display followed by a running description of the

instrument boot sequence. When the boot sequence

is complete, the calorimeter Main Menu is dis-

played. Go to the Calorimeter Operation page and

turn the heater and pump on. This begins circulating

and heating the calorimeter jacket water. Add water

to the filling elbow at the rear of the instrument as

required in order to keep it full.

Jacket Cooling Water Connection

It becomes necessary to use the jacket cooling water

connection only if the calorimeter operating room

temperature exceeds 24 °C (75 °F).

When required, an external water source is used to

cool the jacket of the 6200 Calorimeter. This is done

in either of the following ways:

1. Tap water is used for cooling and then run to a

drain.

2. Cooling water is re-circulated to the calorimeter

from a Parr 6510 Water Handling System.

The water that provides the cooling goes through a

heat exchanger and does not mix with the water in

the jacket and its reservoir. There is a very low cool-

ing load and tap water up to a temperature of 27 °C

should be adequate.