beautypg.com

Hanna Instruments PCA 310 User Manual

Page 70

background image

70

Allow sulfuric acid to stand in the measuring cell for 15 min-
utes to dissolve any foreign materials adhering to the cell walls.
Wipe the cell interior with a cotton-tipped swab. After wiping,
open the drain port to empty the measuring cell from the clean-
ing solution.

CHANGING MEASURMENT CELL

To change the measuring cell (#7 page 10) with a new one
(HI 70487) in the PCA310 - 330 analyzers, follow the steps:

Stop the analyser by turning off the main switch.

Remove the reagent and buffer bottles to free space.

Disconnect the reagent and buffer tubes from the cell
body.

Disconnect the sample inlet tube from the cell body. This
tube is between electrovalve (#21 pag 10) and cell.

Disconnect the drain tube (#8 on page 10) from the cell.

Unplug the cell connector.

Unscrew the cell from its support by using hexagonal
wrench.

Put the new cell in its place and screw it in position. Take
care to position the electrical cable first.

Reconnect the electrical wires and the pneumatic circuit
as it was at the dismounted cell.

Power on the PCA310 - 330 analyzer.

Go to menu mode “Chlorine Menu” - “Cal measuring
Cell” and start the “Calibration Blank” function.

Confirm by pressing “CFM” when asked “Start the blank
calibration?”.

Wait for the end of the procedure.

If the message Press CFM appears, the procedure was
successful and Pressing “CFM” will save the coeficients
for the new cell.

If the message “failed” appears, the cell is not working
properly. Check the electrical cable connection and if the
error persist call Hanna Service.

Prime the reagent pump - see page 36 for details.

Wait 3 cycles for the measurement to stabilize.

Calibrate the measuring cell as described at page 40.

Note:

Before start measuring assure that a stirring bar (HI 70487)

is present in the cell.

This manual is related to the following products: