beautypg.com

Ditch Witch RT115 User Manual

Page 80

background image

RT115 Tier 3- TRANSPORTATION

TOW

80

RT115 Tier 3 - TRANSPORTATION

TOW

Procedure

1.

Engage parking brake.

2.

Attach tow line to all available tie-down points facing towing
vehicle.

3.

Block front and rear tires to prevent unit from rolling.

4.

Activate the tow valve.

Remove floor plate.

Turn tow valve
counterclockwise two
complete times.

Replace floor plate.

5.

Fasten seatbelt and adjust seatbelt.

6.

Remove blocks.

7.

Disengage parking brake.

8.

Use service brake to control unit.

9.

After towing, turn tow valve clockwise two complete times.

NOTICE: Do not turn tow valve more than two times.

Procedure

1.

Engage parking brake.

2.

Attach tow line to all available tie-down points facing towing
vehicle.

3.

Block front and rear tires to prevent unit from rolling.

4.

Activate the tow valve.

Remove floor plate.

Turn tow valve
counterclockwise two
complete times.

Replace floor plate.

5.

Fasten seatbelt and adjust seatbelt.

6.

Remove blocks.

7.

Disengage parking brake.

8.

Use service brake to control unit.

9.

After towing, turn tow valve clockwise two complete times.

NOTICE: Do not turn tow valve more than two times.