beautypg.com

Emergency procedures – Ditch Witch RT115 User Manual

Page 47

background image

RT115 Tier 3 - SAFETY

47

EMERGENCY PROCEDURES

RT115 Tier 3 - SAFETY

47

EMERGENCY PROCEDURES

EMERGENCY PROCEDURES

Before operating any equipment, review emergency procedures
and check that all safety precautions have been taken.

EMERGENCY SHUTDOWN - Turn ignition switch to stop position
or push remote engine stop button.

Electric Strike Description

When working near electric cables, remember the following:

Electricity follows all paths to ground, not just path of least
resistance.

Pipes, hoses, and cables will conduct electricity back to all
equipment.

Low voltage current can injure or kill. Almost one-third of
work-related electrocutions result from contact with less than
440 volts.

Most electric strikes are not noticeable, but indications of a strike
include:

power outage

smoke

explosion

popping noises

arcing electricity

If any of these occur, assume an electric strike has occurred.

EMERGENCY PROCEDURES

Before operating any equipment, review emergency procedures
and check that all safety precautions have been taken.

EMERGENCY SHUTDOWN - Turn ignition switch to stop position
or push remote engine stop button.

Electric Strike Description

When working near electric cables, remember the following:

Electricity follows all paths to ground, not just path of least
resistance.

Pipes, hoses, and cables will conduct electricity back to all
equipment.

Low voltage current can injure or kill. Almost one-third of
work-related electrocutions result from contact with less than
440 volts.

Most electric strikes are not noticeable, but indications of a strike
include:

power outage

smoke

explosion

popping noises

arcing electricity

If any of these occur, assume an electric strike has occurred.