Ditch Witch RT115 User Manual
Page 125
RT115 Tier 3 - SAW ATTACHMENT
125
OPERATION
RT115 Tier 3 - SAW ATTACHMENT
125
OPERATION
Backfilling
1.
Position unit at end of trench, several feet from spoils. Aim
tractor at outer edge of spoils.
2.
Adjust backfill blade to fit land contour.
3.
Move outer edge of spoils toward trench. Take two or more
passes at spoils rather than moving all spoils at once.
4.
Repeat on other side of trench, if necessary.
5.
Engage float and make final pass over trench.
EMERGENCY SHUTDOWN - Turn ignition switch to STOP.
Backfilling
1.
Position unit at end of trench, several feet from spoils. Aim
tractor at outer edge of spoils.
2.
Adjust backfill blade to fit land contour.
3.
Move outer edge of spoils toward trench. Take two or more
passes at spoils rather than moving all spoils at once.
4.
Repeat on other side of trench, if necessary.
5.
Engage float and make final pass over trench.
EMERGENCY SHUTDOWN - Turn ignition switch to STOP.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)