Ditch Witch RT115 User Manual
Page 161
RT115 Tier 3 - SERVICE
161
10 HOUR SERVICE
RT115 Tier 3 - SERVICE
161
10 HOUR SERVICE
Check Wheel Lug Nuts
Check tightness of wheel lug nuts (1) every 10 hours. Tighten
lugnuts to 295 ft•lb (400 N•m).
Trencher
Lube Trencher Tail Roller
Wipe zerks clean and lube every 10 hours with EPG. Lube roller
zerks on both sides of boom.
Check Wheel Lug Nuts
Check tightness of wheel lug nuts (1) every 10 hours. Tighten
lugnuts to 295 ft•lb (400 N•m).
Trencher
Lube Trencher Tail Roller
Wipe zerks clean and lube every 10 hours with EPG. Lube roller
zerks on both sides of boom.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)