Tiedown – Ditch Witch RT115 User Manual
Page 71
RT115 Tier 3 - TRANSPORTATION
71
TIEDOWN
RT115 Tier 3 - TRANSPORTATION
71
TIEDOWN
TIEDOWN
Tiedown Points
Tiedown points are identified by
tiedown decals. Securing unit to trailer
at any other points may be unsafe and
can damage machinery.
Tractor
Attach tiedowns at front and rear tiedown points. Make sure
tiedowns are tight before transporting unit.
Incorrect procedures could
result in death, injury, or property damage.
Learn to use equipment correctly.
TIEDOWN
Tiedown Points
Tiedown points are identified by
tiedown decals. Securing unit to trailer
at any other points may be unsafe and
can damage machinery.
Tractor
Attach tiedowns at front and rear tiedown points. Make sure
tiedowns are tight before transporting unit.
Incorrect procedures could
result in death, injury, or property damage.
Learn to use equipment correctly.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)