Ditch Witch RT115 User Manual
Page 207
RT115 Tier 3 - SERVICE
207
AS NEEDED
RT115 Tier 3 - SERVICE
207
AS NEEDED
15. Tighten chain by pumping EPG into grease cylinder.
Time Augers
Ensure that augers are balanced, as shown. If auger timing is off,
unit will bounce from side to side even in normal digging
conditions.
To adjust timing:
•
Remove bolts holding augers to auger shaft and rotate either
auger as needed until augers are balanced.
•
Reinstall bolts and tighten securely.
g6jmg01h.tif
15. Tighten chain by pumping EPG into grease cylinder.
Time Augers
Ensure that augers are balanced, as shown. If auger timing is off,
unit will bounce from side to side even in normal digging
conditions.
To adjust timing:
•
Remove bolts holding augers to auger shaft and rotate either
auger as needed until augers are balanced.
•
Reinstall bolts and tighten securely.
g6jmg01h.tif
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)