Operation – Ditch Witch RT115 User Manual
Page 138
RT115 Tier 3- BACKHOE ATTACHMENT
OPERATION
138
RT115 Tier 3 - BACKHOE ATTACHMENT
OPERATION
OPERATION
1.
Use boom/swing control and bucket/dipper control to dig hole
or trench.
•
Keep dipper and
boom at right
angles as much
as possible for
maximum power.
•
Keep bucket in
line with dipper as
much as
possible.
•
Position bucket
so teeth cut soil.
As soil is cut, curl
bucket under
dipper.
•
Move dipper and
bucket together.
Increasing
engine speed will
not increase
backhoe force.
om1761
om1762
OPERATION
1.
Use boom/swing control and bucket/dipper control to dig hole
or trench.
•
Keep dipper and
boom at right
angles as much
as possible for
maximum power.
•
Keep bucket in
line with dipper as
much as
possible.
•
Position bucket
so teeth cut soil.
As soil is cut, curl
bucket under
dipper.
•
Move dipper and
bucket together.
Increasing
engine speed will
not increase
backhoe force.
om1761
om1762
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)