Potholing, Leaving jobsite, Storing equipment – Ditch Witch FXT60 User Manual
Page 54
FX60/FXT60 Tier 4 Operator’s Manual
Operation Overview - 53
Potholing
CMW
®
Potholing
1.
Connect hoses (page 66).
2.
Start unit (page 69).
3.
Pothole (page 72).
4.
Disconnect hoses (page 83).
5.
Drain tank (page 74).
Leaving Jobsite
1.
Rinse unit and tools (page 83).
2.
Stow tools (page 84).
Storing Equipment
1.
For cold weather storage, antifreeze vacuum excavation unit (page 82).
2.
For long-term storage, disconnect battery disconnect switch (page 35).
This manual is related to the following products:
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)