Reznor R6GN Unit Installation Manual User Manual
Page 32

32
Table 6. Electrical Data
u
NI
t
M
o
DE
l
N
u
MBER
HE
a
t
ING INP
ut
(BTU/Hr)
IND
uc
ER
M
oto
R
R
la
N
o
MIN
al
E
l
E
ct
RI
cal
S
u
PP
lY
V
o
lta
G
E
R
a
NGE
co
MPRESS
o
RS
(2)
ea.
out
D
oo
R
M
oto
R
B
lo
WER
DRIVE
SYS
t
EM
IND
oo
R
M
oto
R
SING
l
E
c
IR
cu
It
MINIM
u
M
c
IR
cu
It
a
MP
a
c
It
Y
M
a
X.
o
VER-
cu
RREN
t
PR
o
t
E
ct
Io
N
N
a
t.
G
a
S
l
P
Min.
Max.
R
la
l
R
a
F
la
Qty
.
F
la
R6GN-150C-180C
180,000
153,000
1.4
208-230/3/60
187
253
22.4
149
2.8 ea.
2
LSD
8.7
64.7
80
HSD
13.8
69.8
90
R6GN-150D-180C
180,000
153,000
1.4
460/3/60
414
506
10.6
75
1.4 ea.
2
LSD
3.9
30.6
40
HSD
6.5
33.2
40
R6GN-150C-270C
270,000
230,000
1.4
208-230/3/60
187
253
22.4
149
2.8 ea.
2
LSD
8.7
64.7
80
HSD
13.8
69.8
90
R6GN-150D-270C
270,000
230,000
1.4
460/3/60
414
506
10.6
75
1.4 ea.
2
LSD
3.9
30.6
40
HSD
6.5
33.2
40
R6GN-180C-270C
270,000
230,000
1.4
208-230/3/60
187
253
25.0
164
2.3 ea.
3
LSD
13.8
77.0
100
HSD
13.8
77.0
100
R6GN-180D-270C
270,000
230,000
1.4
460/3/60
414
506
12.2
100
1.2 ea.
3
LSD
6.5
37.6
50
HSD
6.5
37.6
50
R6GN-180C-315C
315,000
268,000
1.4
208-230/3/60
187
253
25.0
164
2.3 ea.
3
LSD
13.8
77.0
100
HSD
13.8
77.0
100
R6GN-180D-315C
315,000
268,000
1.4
460/3/60
414
506
12.2
100
1.2 ea.
3
LSD
6.5
37.6
50
HSD
6.5
37.6
50
N
o
t
E:
FLA
=
Full
Load
Amps;
LRA
=
Loc
ked
Rotor
Amps;
RLA
=
Rated
Load
Amps;
LSD
=
Lo
w
Static
Blo
w
er
Dr
iv
e;
HSD
=
High
Static
Blo
w
er
Dr
iv
e
- UDAP Unit Installation Manual (40 pages)
- UDBP Unit Installation Manual (44 pages)
- UEAS Unit Installation Manual (44 pages)
- VPS Unit Installation Manual (44 pages)
- VPT Unit Installation Manual (40 pages)
- VCS Unit Installation Manual (48 pages)
- CAUA Unit Installation Manual (44 pages)
- EEDU Unit Installation Manual (32 pages)
- LDAP Unit Installation Manual (44 pages)
- MASA Unit Installation Manual (40 pages)
- RDF Unit Installation Manual (28 pages)
- RPB Unit Installation Manual (40 pages)
- SC Duct Furnace Unit Installation Manual (40 pages)
- SSCBL Unit Installation Manual (60 pages)
- X Unit Installation Manual (32 pages)
- ZQYRA Unit Installation Manual (72 pages)
- ADF Unit Installation Manual (28 pages)
- F Unit Installation Manual (40 pages)
- PDH (Indoor PreevA) Unit Installation Manual (72 pages)
- MAPSIII Unit Installation Manual (76 pages)
- RDH (Outdoor PreevA) Unit Installation Manual (68 pages)
- RP (Outdoor Duct Furnaces) Unit Installation Manual (32 pages)
- YDHA Unit Installation Manual (76 pages)
- OH Unit Installation Manual (28 pages)
- RBL (Cabinet Blower) Unit Installation Manual (12 pages)
- REC (Evaporative Cooling) Unit Installation Manual (12 pages)
- RIHN Unit Installation Manual (20 pages)
- UDAP Option - Installation - Power Venting (12 pages)
- UDAS Option - Installation - Separated Combustion Venting (16 pages)
- WS Unit Installation Manual (15 pages)
- EBHB Option - Installation - Thermostat Kit (2 pages)
- EFMA Unit Installation Manual (27 pages)
- EWHB Unit Installation Manual (9 pages)
- EXUB Unit Installation Manual (16 pages)
- XAWS Unit Installation Manual (12 pages)
- XAWU Unit Installation Manual (12 pages)
- XBWU Unit Installation Manual (12 pages)
- MAPS III Option - Installation - Energy Recovery Module Installation (12 pages)
- UDAP in sizes 30 through 125 Option - Installation - Ceiling Suspension Kit (2 pages)
- UEAS Option - Installation - Downturn Nozzles - V3 (4 pages)
- UDBP Option - Installation - Polytube Adapter Instructions (4 pages)
- UDBS Option - Installation - Vertical Louvers - V3 Series (2 pages)
- B Option - Installation - Blower/Filter Cabinet (4 pages)
- PDH with 1-stage gas control or 2-stage gas control Gas Conversion Kit Instructions (8 pages)
- VP series infrared heaters High altitude conversion instructions (12 pages)