9 completing the installation – NORAC UC4+BC+AN2 User Manual
Page 37
34
4.9 C
OMPLETING THE
I
NSTALLATION
1. Start up your sprayer and test the
sprayer’s functionality. The NORAC
Control Panel does not need to be
powered up for the original switches to
function. Unfold the booms and
raise/lower each boom and main
section.
Again confirm that the
cabling/hoses are agreeable to
the entire range of motion.
2. If any functions do not work, review the
hydraulic and electrical portions of this
manual to check for proper installation.
If you still have trouble, contact
NORAC for assistance.
3. Turn on the power for the UC4+
Control Panel using the switch on the
side of its chassis.
4. Repeat the Boom Speed Test as
described in Section 4.3 Boom Speed
Test with the NORAC UC4+ Spray
Height Control system installed.
Record the results for comparison in
Table 5.
5. The procedure for the installation of the
UC4+ Spray Height Control system is
now complete. Begin the AUTOMATIC
SYSTEM SETUP procedure as described
in the UC4+ Sprayer Boom Control
Operator’s Manual (M01).
6. For a pull type sprayer, there should be
very little play at the hitch clevis for
optimal performance of the UC4+ Spray
Height Control system. The addition of
polymer washers can help tighten up
this connection (Figure 41).
Figure 41: Hitch Point