Figure 34: Valve Cable Connections

12. Connect the CAN Node cable (C02B)

to the 4-pin AMP plug on C11 (Figure
35
).

13. Route the CAN Node cable (C02B) to

the roll sensors. Follow existing cables
and/or hydraulic lines.

14. Connect the sensor branch cable (C02)

to the 4-pin AMP plug on C02B
(Figure 35).

15. Route the sensor branch cable (C02) to

the wing and main sensors. Follow
existing cables and/or hydraulic lines
along the boom.

16. Cable-tie the installed cables every 12

inches.

IMPORTANT:

Provide enough slack in all cables to

account for the movement of the
main section, parallel lift, and
FOLDING boom movement.

Figure 35: Cable Configurations: C11,

C02B and C02