beautypg.com

NORAC UC4+BC+AN2 User Manual

Page 35

background image

32

Figure 37: Cable Configurations: Electrically Teed Installation

Figure 38: Schematic Diagram: Electrically Teed Installation

1. Connect the 6-pin Shroud (S6) on the

generic interface cable (C12A) to the
mating 6-pin Tower (T6A) on C11.

2. If there is an enable or bypass valve on

the sprayer block, connect 3-pin Shroud
(S3) of C13 to the mating 3-pin Tower
(T3) on C11.

3. Route the free end(s) of C12A (and

C13) to the existing valve block.

4. Splice the loose wires of C12A (and

N1C of C13) into the existing wiring to
tee in to appropriate functions of the
sprayer’s control system. Each function

is labeled on the wire of NORAC
cables. Check each sprayer wire you will
be splicing to before connecting the
wires. Figure 38 is the typical
schematic diagram of cable connections
for Electrically Teed Installation.

N1A and N1B of C13 are not used

for this installation.

5. Disconnect the electrical connections of

the left/right boom tilt functions: Left
Up, Left Down, Right Up and Right
Down, from the sprayer’s existing
valves.