2 single acting assembly, 2 valve mounting – NORAC UC4+BC+AN2 User Manual
Page 28
25
4.7.1.2 Single Acting Assembly
1.
Install the orifices (F08) into the “B”
ports with the notch facing outward
as shown in Figure 28.
2.
Install the 6MB-6MJ fittings (F07) into
the “B” ports and tighten to 18 ft-lbs.
3.
Install the 6MBP plugs (F09) into the
“A” ports and tighten to 18 ft-lbs.
Figure 28: Single Acting Valve Block
4.7.2 Valve Mounting
1. Mount the NORAC valve (V01) on the
sprayer using the valve mounting
bracket (B10).
2. Thread a nut onto the short threads of
each of the threaded studs.
3. As shown in Figure 29, screw the
short side of the threaded rods into the
bottom of the valve block and tighten
the hex nuts tight to the valve block.
4. Place the valve block onto a frame
member, with the studs extending to
the other side of the member.
5. Slide the flat bar from the bracket over
the studs and install a spring washer and
nut onto each of the studs to hold the
plate in place.
6. Tighten the two nuts so the valve block
is held on tight and cannot move.
7. Cut excess off of the studs, if necessary.
If you wish to use bolts, the bolts
should thread into the valve
block at least 3/8". The valve
mounting holes are drilled and
tapped 3/8 NC-1" deep. The rule
of thumb for bolt length is 1-1/2"
longer than the tube size.
You must ensure no hydraulic
components will interfere with
any sprayer parts or be pulled
tight at any time.
Figure 29: Valve Mounting Location