beautypg.com

NORAC UC4+BC+AN2 User Manual

Page 36

background image

33

4.8.2 Cable Installation: Hydraulically Teed Installation

Figure 39: Cable Configurations: Hydraulically Teed Installation

Figure 40: Schematic Diagram: Hydraulically Teed Installation

1. Connect the 6-pin Shroud (S6) on the

generic main interface cable (C12B) to
the mating 6-pin Tower (T6A) on C11.

2. Connect 3-pin Shroud (S3) of C13 to

the mating 3-pin Tower (T3) on C11.

3. Route the free ends of C12B and C13

to the existing valve block.

4. Splice the loose wires of C12B and of

C13 into the existing wiring to tee in to
appropriate functions of the sprayer’s
control system. Each function is labeled
on the NORAC wires. Check each
sprayer wire you will be splicing to
before connecting the wires. Figure 40
is the typical schematic diagram of cable
connections for Hydraulically Teed
Installation.