beautypg.com

Carrier V2203-DI (26--00128) User Manual

Page 65

background image

62--11362

5--1

SECTION 5

FUEL SYSTEM

5.1

CHECKING AND ADJUSTING

5.1.1 Injection Timing

1. Remove the fuel speed solenoid.

2. Remove the injection pipes and nozzle.

3. Move the speed control lever to the maximum speed

position.

NOTE

Turn the flywheel with a screwdriver.

4. Turn the flywheel counterclockwise (facing the fly-

wheel) until the fuel fills up the hole of the delivery
valve holder for #1 cylinder.

5. Turn the flywheel further and stop turning when the

fuel begins to flow over.

6. Open the view port on the flywheel bell housing and

read the number on the flywheel. The number indi-
cated is the timing value for the engine. (The flywheel
has a mark ’1TC’ and marks every 5

°

of engine timing

to 25

°

total).

Injection Timing

Factory

Specification

0.0568 to 0.0829 rad.

3.25

°

to 4.75

°

B.T.D.C.

NOTE

Injection timing adjustment is accomplished by
adding or removing shims under the injection
pump.

The timing advances by removing one shim and
retards timing by adding the same shim.

The addition or removal of 0.05 mm (0.0020 in.)
of shim, changes the injection timing by approx-
imately 0.009 rad. (0.5

°

).

Sealant should be applied to both sides of soft
metal gasket shims except for the .0175mm
shim. A .0175mm shim should have sealant ap-
plied to one side only.

When replacing the injection pump be sure to
use the same number and size of new gasket
shims.

5.1.2 Shim Identification

Shims are available in thicknesses of 0.20 mm,
0.25 mm, 0.30 mm, and 0.35mm. Combine
shims for adjustments.

1. Delivery Valve Holder

2. Timing Mark

3. 2--Holes: 0.20 mm shim

4. 1--Hole: 0.25 mm shim

5. 0--Holes: 0.30 mm shim

6. 3--Holes: 0.35 mm shim

7. 2--Holes: 0.175 mm shim