beautypg.com

Suggested installation detail for grease hoods, Hood above ceiling, Hood – FloAire Pyroscat Enclosure User Manual

Page 26: Hood below ceiling wrapped unwrapped

background image

www.morganthermalceramics.com

Page 25

P029_02:2014

Fire Rated Enclosure

Installation Technique and Design

Advisory Manual

Hood installation must be approved and in compliance with the code.

All joints should be installed with tight butt joints on both layers, or minimum 3" overlap on outside layer.

Minimum 12 gauge steel insulation pins

Two layers XL Insulation installed per UL Listing HNKT-G18

Pins are installed on 10-1/2" o.c., and centered on 3" overlaps or maximum 3" on both sides of outside layer butt joints.

XL022-2

4

Notes:

5

2

3

1

LEGEND

Steel banding 1/2" wide min.

Butt Joints (shown) or 3" min perimeter overlap - see note on pin spacing

Speed clips

Suggested Installation Detail For Grease Hoods

5

4

3

Ceiling

Hood Above Ceiling

4

3

3

4

Ceiling

Hood

Hood

1

Ceiling

Ceiling

Hood

Hood

5

Hood Below Ceiling

Wrapped

Unwrapped

4

3

There is no test standard for wrapping grease duct hoods. Approval is subject to the Authority Having Jurisdiction

The integrity of the Thermal Ceramics duct systems is limited to the quality of the installation.

1

1

1

2

2

2

2

P029_Install_PS_2 2014.indd 25