AERCO CXT-E Retrofit Kit User Manual
Technical instructions
This manual is related to the following products:
Table of contents
Document Outline
- 1. INTRODUCTION
- 2. EQUIPMENT ISOLATION AND REMOVAL PROCEDURES
- 3. RECOMMENDED REPLACEMENT OF VALVE ASSEMBLY PARTS
- 4. INSTALLATION OF RETROFIT KIT ITEMS
- 4.1 Installation of Control Valve Actuator and Linkage Assembly
- 4.2 Installation of ECS Components on Top Head Assembly
- 4.3 Flow Meter Installation
- 4.4 Boiler Water Inlet and Outlet Temperature Sensors – (Water-to-Water Heaters)
- 4.5 Compound Pressure Gauge
- 4.6 Installation of New Orifice Disc
- 4.7 ECS Control Box Installation
- 5. POST INSTALLATION CONNECTIONS AND ADJUSTMENTS