Neptronic – AERCO CXT-E Retrofit Kit User Manual
Page 39
ECS and CXT-E Retrofit Instructions Kit # 27004-TAB
Technical Instruction Document
TID-0141_0A
12/30/2014
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, New York 10913 • Phone: 800-526-0288 Page 39 of 76
2. Slide the Actuator onto the Linkage Assembly Shaft (Figures 4-2 & 4-4). Ensure that the pin
on the Linkage Assembly is inserted in the center slot on the bottom of the Actuator (Figure
4-4).
3. Press down on the Linkage Adapter and verify that the Indicator Plate is aligned with the “0”
Scale marking.
4. With the Indicator Plate properly aligned, tighten the U-bolt hex nuts using an 8 mm wrench.
Torque the nuts to 60 in-lbs.
5. This completes the mechanical installation of the Actuator Assembly. The electrical
connections will be made during installation of the Control Box in section 4.7.
0
90
neptronic
1 2 3
COVER
SET SCREW
CLUTCH
DIAL &
POINTER
CENTER
SLOT
COVER
CABLE
CONNECTOR
LINKAGE
SHAFT
Figure 4-4. Actuator Assembly, Part No. 69170