beautypg.com

3 method for wiring to signal input terminals – KEYENCE SL-R11 User Manual

Page 27

background image

Chapter 4 Wiring

4-3

4

ENGLISH

4-3 Method for Wiring to Signal Input Terminals

As shown in the table below, the SL-R11 is provided with a signal input terminal block. First loosen the
terminal block screws, and then retighten the terminal block screws after inserting the signal cables.

Input terminals

Terminal No.

Name

1, 2

Start / Restart input

3, 4*

1

TEST input

5, 6*

1

M/S SELECT input *

2

7, 8

MPCE MONITOR input

9, 10*

1

E-STOP1 input

11, 12*

1

E-STOP2 input

*1 When the SL-R11 is shipped, short bars are
connected across terminal Nos. 3 and 4, 5 and 6,
9 and 10, and 11 and 12.
To use the functions assigned to these terminals,
remove the short bar and wire the terminal.
*2 Main/Sub select input

See Instruction Man

ual.

MPCE2

MPCE1

T R

POWER

FSD-ON

FSD-OFF

INTERLOCK

LOCKOUT

RESTART

TEST

MPCE

E-STOP1

E-STOP2

CAUTION

Electric shock

2

1

3

Tighten with flat-head
screwdriver

Insert wire

Loosen with flat-head
screwdriver

• Tightening torque

4.4 lb•in (0.5 N•m)

• Wire rating

AWG #22 to 14 (Stranded only, Copper only, min. 60 °C)

• Cable stripping dimension

10mm

(0.39")