2 inspection and adjustment, 2inspection and adjustment, Inspection and adjustment 2 8 – Cub Cadet 7532 User Manual
Page 225

Inspection and Adjustment
2
8
2
Inspection and Adjustment
1
Start Switch
Using the circuit tester, make sure that continuity
between terminals for the start switch becomes as shown
in the figure.
• If the continuity is not as shown in the figure,
change the start switch.
2 Combination Switch
Using the circuit tester, make sure that continuity
between terminals for the combination switch becomes as
shown in the figure.
• If the continuity is not as shown in the figure,
change the combination switch.
W/B
W/B
BAT
LOAD
ST
BW
BW
OFF
ON
ST
Wiring Color
Continuity:
BY
BY
GZ3W41-006
Lighting SW
Flasher SW
OFF
L
RL
RB
RB
RB
RB
Y
GR
RL
A
A
GL
R
L
GL GR
Y
R
GZ3W41-007
This manual is related to the following products: