beautypg.com

BUCHI Nano Spray Dryer B-90 User Manual

Page 36

background image

5 Putting into operation

36

B-90 Operation Manual, Version B

5.2.2

Short set-up with short metal bars

NOTE
Parts (
ae) and the black holders (g), are factory pre-installed.

a Screw the four lower metal bars into the housing basement with a flat spanner.
b Fix the four adjusting rings onto the previously installed metal bars.
c Mount four short headless screws onto the lower metal bars. Use a hex-wrench to screw

them tightly in.

d Screw the middle metal bars tightly onto the lower ones.
e Mount the four long headless screws onto the upper metal bars. Use a hex-wrench to screw

them tightly in.

f Put the four counter nuts upside-down and onto the long headless screws on top of the bars and

turn them clockwise to the lowest possible position.

g To install the bar holders, first screw the holder base at the housing. Use the metal bars for align-

ment. Subsequently attach the side of the holders with the side caps and three screws.