BUCHI Nano Spray Dryer B-90 User Manual
Page 36
5 Putting into operation
36
B-90 Operation Manual, Version B
5.2.2
Short set-up with short metal bars
NOTE
Parts (a – e) and the black holders (g), are factory pre-installed.
ቢ
ባ
ቤ
ብ
ቦ
ቧ
ቨ
a Screw the four lower metal bars into the housing basement with a flat spanner.
b Fix the four adjusting rings onto the previously installed metal bars.
c Mount four short headless screws onto the lower metal bars. Use a hex-wrench to screw
them tightly in.
d Screw the middle metal bars tightly onto the lower ones.
e Mount the four long headless screws onto the upper metal bars. Use a hex-wrench to screw
them tightly in.
f Put the four counter nuts upside-down and onto the long headless screws on top of the bars and
turn them clockwise to the lowest possible position.
g To install the bar holders, first screw the holder base at the housing. Use the metal bars for align-
ment. Subsequently attach the side of the holders with the side caps and three screws.